SUÍÇA · PAISAGEM · LOCAIS CONTAMINADOS
Kataster der belasteten Standorte
O que esta camada mostra
The cantons' registers of polluted sites under Art. 32c USG and the Contaminated Sites Ordinance: disposal, operating and accident sites where pollution by waste is established or very likely, with their status from “no harmful or unpleasant effects expected” to “needs remediation”. Selling or dividing a parcel with a registered site needs the authority's permission (Art. 32dbis para. 3 USG), and for a building project excavated material and its disposal should be clarified early. Federal sites, the armed forces, public transport, civil aerodromes, are on separate layers. Included: the cantons of AG, AI, AR, BE, BL, BS, FR, GE, GL, GR, JU, LU, NE, SH, SO, SZ, TG, TI, UR, VS, ZG and ZH; cantons whose terms of use do not allow use in this app, or that do not publish the data openly, are not included. For the canton of Graubünden's data: “No warranty is given as to the correctness, accuracy, currency or completeness of the published information.”
Publicador e licença
Kantone AG/AI/AR/BE/BL/BS/FR/GE/GL/GR/JU/LU/NE/SH/SO/SZ/TG/TI/UR/VS/ZG/ZH über geodienste.ch (Quelle: Kataster der belasteten Standorte (KbS), Kanton Graubünden, 2026), Nutzungsbedingungen der Kantone
O publicador não indica licença
Kantone AG/AI/AR/BE/BL/BS/FR/GE/GL/GR/JU/LU/NE/SH/SO/SZ/TG/TI/UR/VS/ZG/ZH über geodienste.ch (Quelle: Kataster der belasteten Standorte (KbS), Kanton Graubünden, 2026), Nutzungsbedingungen der Kantone
De onde vêm os dados
WFS · geodienste.ch
O Merestone consulta este serviço em direto para a área no ecrã. Nada é copiado nem guardado para além de uma cache breve.
Dados apresentados por elemento
Número de cadastro · Estado segundo a AltlV · Medidas de investigação · Observação · Autoridade competente · Cantão
Nestas predefinições
Avaliação ambiental
Where an environmental consultancy starts a site assessment: the federal biotope inventories, forest reserves and wildlife rest zones, the state of the rivers, wildlife corridors and amphibian crossing sites, the sites of threatened mosses, and the groundwater protection zones, hazard map and polluted-site registers of the cantons that publish them openly.
Construção e planeamento
The rules a building project meets first: building zones, primary and overlay land use, planning zones, noise sensitivity levels, crop rotation areas, static forest boundaries and river space, national road building lines and aerodrome safety zones, polluted sites, ISOS and IVS. For a parcel, the ÖREB cadastre remains what binds.