ZWITSERLAND · LANDSCHAP · RUIMTELIJKE PLANNING
Richtplanung — Windenergie
Wat deze laag toont
The areas for wind energy in the cantonal structure plans under Art. 8b RPG, as settled coordination, interim result or preliminary information. The structure plan binds the authorities, not landowners: a turbine additionally needs land-use planning and a building permit. Included: the cantons of AG, AI, AR, BE, BL, FR, GE, GL, JU, LU, NE, SH, SO, SZ, TG, TI, UR, VS, ZG and ZH; cantons whose terms of use do not allow use in this app, or that do not publish the data openly, are not included.
Bronhouder en licentie
Kantone AG/AI/AR/BE/BL/FR/GE/GL/JU/LU/NE/SH/SO/SZ/TG/TI/UR/VS/ZG/ZH über geodienste.ch, Nutzungsbedingungen der Kantone
De bronhouder vermeldt geen licentie
Kantone AG/AI/AR/BE/BL/FR/GE/GL/JU/LU/NE/SH/SO/SZ/TG/TI/UR/VS/ZG/ZH über geodienste.ch, Nutzungsbedingungen der Kantone
Waar de data vandaan komt
WFS · geodienste.ch
Merestone vraagt deze dienst live om het gebied op het scherm. Niets wordt gekopieerd of bewaard buiten een korte cache.
Gegevens die per object worden getoond
Objecttype · Beschrijving · Besluit van het kanton · Kanton
In deze voorinstellingen
Bouwen en plannen
The rules a building project meets first: building zones, primary and overlay land use, planning zones, noise sensitivity levels, crop rotation areas, static forest boundaries and river space, national road building lines and aerodrome safety zones, polluted sites, ISOS and IVS. For a parcel, the ÖREB cadastre remains what binds.