FRANCE · LANDSCAPE · RENEWABLE ENERGY
Lignes électriques haute tension (BD TOPO)
What this layer shows
Overhead lines of the electricity transmission network with their voltage, from IGN's BD TOPO. To estimate a project's grid-connection distance.
Publisher and licence
IGN Géoplateforme · Licence Ouverte (Etalab)
© IGN Géoplateforme, Licence Ouverte (Etalab)
Where the data comes from
WFS · data.geopf.fr
Merestone asks this service live for the area on screen. Nothing is copied or stored beyond a short cache.
Facts shown for each feature
Voltage · Managed by
In these presets
Renewables
The constraints analysis of a wind or solar project: acceleration zones and excluded zonings (APER law), existing farms and turbines, high-voltage lines, nuclear installations, with Natura 2000, ZNIEFF and wetlands for the environmental stakes.