FRANCE · LANDSCAPE · RISQUES TECHNOLOGIQUES
Installations nucléaires de base
What this layer shows
Basic nuclear installations with the radius of their special intervention plan (PPI) where one exists.
Publisher and licence
Géorisques (BRGM / Ministère de la Transition écologique) · Licence Ouverte
© Géorisques (BRGM / Ministère de la Transition écologique), Licence Ouverte
Where the data comes from
WFS · www.georisques.gouv.fr
Merestone asks this service live for the area on screen. Nothing is copied or stored beyond a short cache.
Facts shown for each feature
Operator · Type · PPI radius (km)
In these presets
Natural hazards
The risk prevention plan perimeters (flood, ground movement, forest fire, avalanche, marine submersion, technological and mining), the underground cavities, the recorded ground movements, the seismic zoning and the polluted-soil sectors. Each PPR's precise regulatory zoning remains in the document itself.
Renouvelables
The constraints analysis of a wind or solar project: acceleration zones and excluded zonings (APER law), existing farms and turbines, high-voltage lines, nuclear installations, with Natura 2000, ZNIEFF and wetlands for the environmental stakes.