Zum Inhalt springen

Diese Website ist ganz neu, und ich baue noch daran. Die App für iPhone, iPad und Mac ist das fertige Produkt. App holen

VEREINIGTES KÖNIGREICH · ENGLAND · LANDSCHAFT · KÜSTE

Coastal Erosion Projection to 2105 (NCERM 2024)

ProAls Flächen gezeichnetErscheint ab Zoomstufe 10In der Umkreissuche der App

Auf der Karte ansehen

Was diese Ebene zeigt

The Environment Agency's National Coastal Erosion Risk Mapping (2024): land projected to erode by 2105 if the Shoreline Management Plan policy is delivered, with the higher central sea level rise allowance. Distances are cumulative, in metres. A projection for a frontage, not a prediction for a property.

Herausgeber und Lizenz

Environment Agency copyright and/or database right 2025. All rights reserved · Open Government Licence v3.0

© Environment Agency copyright and/or database right 2025. All rights reserved. Open Government Licence v3.0

Amtlicher Leitfaden ↗

Woher die Daten kommen

WFS · environment.data.gov.uk

Merestone fragt diesen Dienst live nach dem Ausschnitt auf dem Bildschirm. Über einen kurzen Zwischenspeicher hinaus wird nichts kopiert oder gespeichert.

Angaben zu jedem Objekt

Prognostizierte Erosion (m) · Einheit · Veröffentlicht

In diesen Voreinstellungen

Küste

The intertidal and soft-cliff suite: saltmarsh, sand dunes, vegetated shingle, maritime cliff and slope, mudflats and saline lagoons: plus Heritage Coast, Marine Conservation Zones, Scottish MPAs, and the SPA and Ramsar designations that nearly always sit over an estuary. The Coast Path is included because access and designation overlap constantly on this kind of site.

Planung

The constraints that shape a red line: SSSI Impact Risk Zones, Green Belt, the Flood Map for Planning zones and storage areas with present-day rivers-and-sea risk, Agricultural Land Classification (both the provisional national map and the more reliable post-1988 surveys), nutrient neutrality catchments, National Parks, National Landscapes and Local Nature Recovery Strategy areas. Useful for a constraints plan or an early feasibility check before any ecology is commissioned.

PRO

Merestone Pro UK

Preise

Weitere Ebenen in dieser Gruppe

Alle Ebenen →